Year
2024 – on going
Location
Saudi Arabia – Riyadh Province
Client
Contractor: Mofarreh AlHarbi & Partners Client: Saudi Irrigation Organization
Project
Pre-Tendering Phase for Consultancy Services for Establishing a Transmission Line to Deliver Treated Water from Al Hayer and Heet Pump Stations
Services
Complete Design Services
Value
Confidential

Hayer Hafeet Pump

Project Description

Mofarreh AlHarbi & Partners aims to deliver the recycled water resulting from the two wastewater treatment plants, Al-Hair and Heet , to the agricultural areas and holdings located between Riyadh and Al-Kharj including:

  • Geotechnical Analysis
  • Engineering works of piping and gravity distribution networks, Pumping stations, , equipment  and  systems,  as  well  as  what  is  necessary  according  to  the  quantity  and  branch  schedule,  connection  points  and  specifications
  • SCADA system design.

Hydrological analysis