Year
2024 – on going
Location
Saudi Arabia – Riyadh Province
Client
Contractor: Mofarreh AlHarbi & Partners Client: Saudi Irrigation Organization
Project
Pre-Tendering Phase for Consultancy Services for Establishing a Transmission Line to Deliver Treated Water from Al Hayer and Heet Pump Stations
Services
Complete Design Services
Value
Confidential
Hayer Hafeet Pump



Project Description
Mofarreh AlHarbi & Partners aims to deliver the recycled water resulting from the two wastewater treatment plants, Al-Hair and Heet , to the agricultural areas and holdings located between Riyadh and Al-Kharj including:
- Geotechnical Analysis
- Engineering works of piping and gravity distribution networks, Pumping stations, , equipment and systems, as well as what is necessary according to the quantity and branch schedule, connection points and specifications
- SCADA system design.
Hydrological analysis