The technical team at ViA International
was involved in complete hydraulic
assessment and studies of the planned
area. Main activities are outlined as
below:
– Thorough Hydrological study
– Proposal of drainage structures based
on the Hydrology of the area.
– Hydraulic Design of the drainage
structures along the access road
– Proposal and Design of protection
structures.