Concept design of Sur Commercial Port Development

Port and Hub Proposal

GROSS SITE AREA (Land
side) 2.449.043,95 sqm
WATER SIDE
INFRASTRUCTURE 1.338.148,48 sqm

TOTAL DEVELOPMENT
AREA 3.787.192,43 sqm

Port Development

Container terminal
Main pier 450.000,00 sqm
Sea side pier 250.000,00 sqm

annual TEU (1-2 cont./m2)
(twenty equivalent units)

700.000 –
1.500.000 TEU

Multipurpose pier 120.000,00 sqm

Pier leghts
Main pier- SW side 750 m
Main pier- NE side 750 m
Terminal pier – SW side 1000 m
Internal quay 500 m
Multipurpose pier 900 m Shipyard
500.000,00 sqm

Inland Development

Logistic 800.000,00 sqm

Small & medium industrial 800.000,00 sqm

Civil (business / housing) 350.000,00 sqm Recreational 150.000,00 sqm

Above, cross section of the break water;
To the right: two images of the 3D
analysis between sea soil and the new piers
(Y scale 5 times X scale)